Build a baseline your field trusts.

From your own as-built projects, with durations set from real crew productivity.

One CPM engine, checked against Primavera P6 — for the superintendent, the scheduler and the project manager, from the first baseline to the final update.

Free 30-minute consultation · P6 XER import · MS Project XML export
Build a baseline — start to finish0:48
Demo project. Figures are from a FinitePath demo run.
  • 99–100%free-float match with Primavera P6.28,000+ activities checked · 0 rule violations
  • XER · XML · XLSXP6, MS Project and Excel files straight in.BOQs in Excel or PDF, drawings and specs — our engineers build from them
  • One partnerfrom the first baseline to the final update.We build it with you, and we stay after it’s built
Data centersHealthcare & hospitalsPower plantsHigh-rise structuresIndustrial facilitiesTransportation & transitPharmaceutical plantsDefense projectsUnified school districtsAircraft hangarsRehabilitation centersWater & wastewaterSemiconductor fabsAirports & terminalsLaboratoriesLogistics & warehousingMixed-use developmentsLevees & flood control
Work with FinitePath engineers

Let’s build your baseline, together.

Tell us about the job. In a free 30-minute consultation, a FinitePath scheduling engineer goes through your scope, drawings and dates with you and shows how the baseline comes together. If it’s a fit, our consultant visits your office to take it forward.

We build it with you

A FinitePath engineer builds the baseline with your superintendent and project team — from your drawings, specs, BOQ and past schedules. And we stay after the build, with support through every update.

Checked at FinitePath

Productivity, sequencing and more: durations tested against crew output, logic checked for open ends and loops, calendars and holidays confirmed — before it reaches your kick-off meeting.

Learn to build it yourself

How do you build a schedule? Learn it step by step with the FinitePath PERT method: start from your WBS and finish with a linked, CPM-calculated schedule.

Baseline schedule

From award to an approved baseline, in one workflow.

Start from what your company has already built. FinitePath ranks your as-built projects by fit, carries their structure and logic across, and lets the field set the durations before anyone presses F9.

  1. 1
    Create the project
    Name, start and finish or duration — enter any two and the third follows.
  2. 2
    Seed the structure
    Match from your as-built library, import a Primavera P6 or Excel file, or start from a blank WBS.
  3. 3
    Answer what you know
    Sector, build nature, structure system, size and trades. FinitePath ranks your templates by fit.
  4. 4
    Launch the best fit
    The WBS, activities, durations, logic and calendars come across. Old dates and actuals stay behind.
  5. 5
    Tune it with Cadence
    Crew productivity, hours per day, handoffs, region and season. The preview re-runs the CPM before you commit.
  6. 6
    Press F9, then kick off
    CPM dates, critical and longest path, schedule health checks. Review it with the team, approve it, save it as the baseline.
What comes across from your as-built
  • WBS structure, renamed for the new job
  • Activities and their durations
  • Logic and lags — FS, SS, FF and SF
  • Calendars, and a budget line per activity
  • Left behind: old dates, actuals, resources, notes and constraints
Ready for the kick-off meeting
  • Open ends and logic loops found before anyone else finds them
  • Schedule health — DCMA-style checks
  • Critical and longest path, side by side
  • Saved as the baseline every update is measured against
Rather have our schedulers build it with you? We develop baselines from your project charter — drawings, specifications, procurement and quality requirements — and hand your team a schedule they can run in FinitePath. Talk to us →
Scenarios & optimization

Pull the finish in. See exactly what it costs.

Any tool can shorten a bar. The question a planner has to answer is what was spent to do it — whose float, which handoffs, how much risk moved onto the trades behind. FinitePath compresses and shows the bill in the same view, so the decision is made with both numbers on screen instead of one.

Cadence — relax ← center → compress
0.00 · within buffer
Restrooms NW
Meeting room
Rough-in
Finishes
Inspections
◀ RELAXCENTERCOMPRESS ▶

Center — the baseline as seeded. No overlap added or removed. Drag right to compress by spending float, or left to add buffer between crew handoffs.

Baseline finish
Jan 13, 2027
311 d
Variant finish
Jan 13, 2027
no change
Float consumed
0 d
36 activities on the critical path
Handoffs rewired
0
nothing applied to the baseline
Duration Optimize

Flags activities whose durations don’t hold up — AACE proportionality violations, activities needing decomposition. Every finding is a proposal you accept or reject.

What-If Scenarios

Forensic closes — as-planned, as-built to date, or closed at a review date.

Cadence Workstation

Rewires crew handoffs across a WBS branch and shows the variant against the baseline ghost, with the float it consumed.

Recovery Potential

An order-of-magnitude estimate of recoverable days, ranked by priority — labeled as an estimate, because that is what it is.

Nothing here commits itself. Every optimization is a variant sitting beside your baseline. You compare it, promote it or discard it — and a recovery figure is always labeled an estimate, never a date the engine cannot defend after a re-run.

Time impact analysis & dispute resolution

When the job slips, your baseline is the evidence.

A delay claim is only as strong as the baseline it is measured from. Because your team built and approved it in FinitePath, every update can be compared back to it — and the delay can be measured, not argued.

Window by window

Every update is kept against the approved baseline. See the days gained or lost between updates and the activities that drove them.

Time impact analysis

Insert a delay fragnet, re-run the CPM and measure the effect on the contract completion date.

Classified for the claim

Each delay marked excusable, non-excusable or concurrent, with the basis noted.

One delay package

Windows, TIA and a written narrative from the same numbers — for negotiation, mediation or arbitration.

Reporting

The report your client actually reads.

Built from the saved F9 calculation — the same numbers as the schedule, not a spreadsheet assembled the night before. Every figure traces back to an activity, and anything the data cannot support prints a diagnostic code instead of a number.

Executive Schedule Analysis Report
Built from the F9 calculation · print-ready PDF
PDF
  • Schedule health — a scored breakdown across schedule, links and progress
  • Critical & longest path — both, with the reconciliation between them stated
  • Float distribution — negative, zero, near-critical and high float by band
  • Earned value — BAC, PV, EV, AC, with CPI and SPI where the data supports them
  • Recovery potential — recoverable days, labeled as an engineering estimate
  • Cover page — optional client and contact name, or omitted entirely
RishEngine™ CPM

CPM math, checked against Primavera P6.

Engine changes are tested against their own CPM rules and against P6’s own results before they ship. A baseline your team builds here holds up when the owner’s scheduler opens it.

0violations of the core CPM rulesForward pass, relationship logic and project finish, on 19 schedules: 28,000+ activities, 38,000+ relationships.
99–100%free-float match with Primavera P6On three real P6 schedules of more than 2,000 activities each.
F9the only step that changes resultsNothing recalculates behind your back. Every screen, scenario and report reads the same saved calculation.
Critical, longest & driving pathsMultiple calendars & holidaysDelay in calendar days, float in working daysCompleted work never shows float

Source: FinitePath CPM invariant checker; P6 comparison on genuine XER files, September 2026.

Who it’s for

Built for the people who answer for the schedule.

Superintendents

Set durations from your crews, not someone else’s guess — and see the plan before kick-off, not at it.

Project engineers & PMs

Build the baseline with your team — or with ours — run F9 at every update, and send the owner a report from the same numbers.

Project controls & owners

Consistent baselines across jobs, schedule health checks, and an honest monthly status.

Claims teams & counsel

Every update kept against the approved baseline: windows, time impact analysis and a delay package.

Video Library

See FinitePath in Action

Product walkthroughs and short learning modules on CPM scheduling, baselines, project monitoring, reporting, and AI-assisted planning — new videos added regularly.

Demo Project — Access
Opening a demo project in FinitePath — CPM calculation, Gantt view and WBS structure.
FinitePath on YouTube
More videos & subscribe

Build your next baseline in FinitePath.

Start from your own as-built projects or a Primavera P6 file. Book a demo, or try it free for 7 days.

Book a demo

Tell us about your next baseline.

A new job to schedule, a P6 file to bring in, or a delay you need measured. A person answers, within one business day. For a free 30-minute consultation, email rajeshkuba@finitepath.com.

Get in Touch

fp@finitepath.com · We reply within 1 business day

🔒 Secure⚡ 1-day reply